Construction Process
Block A13

Time left in phase 1:

Construction Progress Updates

May 11, 2026

  • The concrete structure formation of the elevator shaft at the +19.68 level (8th floor) has been completed

  • The concrete structure formation of the slab at the +23.20 level (final level) has been completed

  • 30 m³ of B25 concrete has been used