Time left in phase 1:
Construction Progress Updates
June 15, 2026
-
Reinforcement works for the slab at elevation +19.68 m (seventh floor) have commenced
-
Blockwork construction has commenced at elevations -0.12 m (first floor) and +3.18 m (second floor)
-
60% of the blockwork has been completed on the first floor
-
90% of the blockwork has been completed on the second floor